Phase 2 is taking longer than expected. I have to take down the microwave, pull out stove and the refrigerator. There are more cabinets in phase 2 than in phase 1.
All cabinet doors taken off. Later decided to remove stove and microwave.
Was running low on supplies. Picked up another Rust-Oleum kit since I was on my last quart of paint.
Bought more foam brushes. The duster can is perfect to use to dust off before painting.